Projects | Sweden
Sundsvall
A collaboration with Sundsvall Energi
Liquid Wind's second facility is designed in cooperation with the energy company Sundsvall Energi and will be located next to the combined heat and power plant Korstaverket in Sundsvall. Biogenic carbon dioxide will be captured from Korstaverket and combined with green hydrogen, produced from renewable electricity and water to generate green electrofuel.
A combined CCU and CCS project
The planned eFuel production in Sundsvall is estimated to contribute to a 283,000 tons reduction of CO2 emissions annually, primarily by replacing marine fossil fuels (approximately 199,000 tons of CO2) and through permanent storage of fossil carbon dioxide (approximately 84,000 tons of CO2). The Carbon Capture and Storage (CCS) and CCS permit is handled through a parallel project, run by Sundsvall Energi: project Phoenix.
Quick facts
Construction start: 2026
Production capacity: up to 130,000 t eMethanol / year
Capture of: 140,000 t biogenic CO2 / year
Avoided emissions: 283,000 t CO2 / year
Related news
Liquid Wind submits environmental permit application for large-scale production of green electrofuel in Sundsvall
Liquid Wind announces plans for its second electrofuel facility, FlagshipTWO, to be established in Sundsvall
Liquid Wind's second eFuel facility granted environmental permit